Projects

Project Experience Across Major Market Sectors

Explore completed and ongoing work supported by detailed estimating, cost planning, scheduling, contract administration, and financial oversight.

LGA Taxi Hold and Amenities Building

The LaGuardia Airport Taxi Hold Amenities Building is a new 3,460-square-foot single-story meditation and amenity facility providing space for 63 occupants, including meditation rooms, restrooms, ablution areas, and support spaces. Costrak Consulting prepared construction cost estimates during design development.

The Edge Condominium

A premier residential complex in Williamsburg, Brooklyn is planning a comprehensive redesign and upgrade of its common areas across its North and South Towers, totaling approximately 660,000 square feet. The 2009 waterfront buildings have experienced wear, water damage, and changing resident needs, prompting a revitalization to restore a modern aesthetic and improve overall conditions.

100 Main Condominium

Provide utility budget cost analysis pertaining to water, electric and gas usage for the condominium in Tuckahoe in Westchester County in the State of New York.

Hoboken Schoolhouse Condominium

The project at 80 Park Avenue involves demolition and new construction for a small 2,205-square-foot commercial space. The scope includes commercial units, lobbies, service areas, and restrooms, along with new interior partitions and upgraded finishes.

Church of Pentecost USA, Bethel Assembly

The project at 616 East 180th Street involves demolition, expansion, and change of use of an existing commercial building into a house of worship. The development includes a total gross floor area of approximately 18,365 square feet and provides spaces such as a main sanctuary, educational rooms, multipurpose room, administrative offices, storage, and circulation areas.

East Orange Recreation Center

Preparation of feasibility study for the creation of a multi-use, intergenerational indoor recreational center in either a newly built space or in one of the existing city-owned facilities at 3 potential sites. H2M was the lead and Costrak Consulting, LLC, prepared construction cost estimates.

Great Falls Pedestrian Footbridge Replacement

The project involves the complete replacement of the Great Falls Footbridge (Frank X Graves, Sr. Bridge), a 100-foot by 6-foot pedestrian bridge located near the Passaic River in Mary Ellen Kramer Park and Overlook Park. The scope includes removal of the existing bridge, off-site fabrication and installation of a new bridge, abutment preparation, and ADA-compliant upgrades to the connecting walkways. Costrak Consulting provided construction cost estimates for multiple design options

Harlem African Burial Ground

The project involves the demolition of the existing 126th Street MTA Bus Depot in East Harlem, led by the New York City Economic Development Corporation in collaboration with the Harlem African Burial Ground Initiative. The scope includes full hazardous material abatement, complete demolition down to slab-on-grade, disconnection and capping of all utilities, and demolition of the chimney. Following demolition, the site will undergo archaeological investigation and is planned for future memorial and mixed-use redevelopment to honor its historical significance as a former African burial ground.

Centre Pointe

The Centre Pointe project involves the construction of a 14-story, 152,000-square-foot mixed-use residential building with 144 apartment units and a cellar level. The development includes a double-height lobby, gym, circulation spaces, mechanical rooms, and 139 stacker parking spaces. The scope also includes demolition of existing buildings, removal of an asphalt parking lot, and site preparation work such as grading, fencing, and sidewalk protection.

Poughkeepsie Garage Repairs

The project involves repairs and upgrades to Poughkeepsie Station Garage, a three-level precast concrete structure built in 2001 with a footprint of approximately 59,508 square feet. The scope includes replacing deteriorated concrete, MEP piping, lighting, a passenger elevator, and the concrete roof deck, along with general structural rehabilitation.

DSNY Queens 7 Garage Renovation

This project involves the repair and renovation of the Queens East 07 garage at 120-15 31st Avenue for the New York City Department of Sanitation. The scope includes assessing architectural, structural, mechanical, and electrical issues and developing a feasibility cost estimate, with Costrak Consulting providing cost reporting services as a subconsultant.

NYCCT Hyflex Project – Culinary Amphitheater

This feasibility study examines the conversion of an existing teaching kitchen and amphitheater into a HyFlex instructional space that supports in-person, remote, and recorded learning. It evaluates architectural, AV/IT, and MEP upgrades needed to modernize the facility, improve safety and accessibility, and create a technology-enabled demonstration environment.